News

Wave-SubseaDesignAS
2026-02-10

Vibration testing & beyond: developing the quick disconnect coupling

Following the previous post introducing the GBM Vibrojet® project, we continue by taking a closer look at the development and testing of the Quick Disconnect Coupling.

In spring 2025, our team successfully completed the prototype testing phase, including tests of release mechanisms, bending and pressure test. The FAT also included vibration testing, as shown in the video below, clearly demonstrating that the assembled coupling withstood the required vibration.

The project benefited from effective communication, a strong pre-engineering phase, solution-oriented suppliers, timely client feedback, and on-time delivery in accordance with the agreement.

Latest News

30/06/2026
News-ServicesSD
Comprehensive subsea engineering solutions
24/06/2026
news-SD-integratedsolutions
Integrated subsea solutions for complex offshore projects
03/06/2026
hydraulic couplers
Proven performance: another successful FAT for our hydraulic couplers
21/05/2026
News-clumpweights
20-Ton Clump Weights Installed Offshore for POSCO International
22/04/2026
Vibrojet Post Image copy
SubseaDesign & GBM Works: Advancing Offshore Wind with Vibrojet®