News

Wave-SubseaDesignAS
2026-02-10

Vibration testing & beyond: developing the quick disconnect coupling

Following the previous post introducing the GBM Vibrojet® project, we continue by taking a closer look at the development and testing of the Quick Disconnect Coupling.

In spring 2025, our team successfully completed the prototype testing phase, including tests of release mechanisms, bending and pressure test. The FAT also included vibration testing, as shown in the video below, clearly demonstrating that the assembled coupling withstood the required vibration.

The project benefited from effective communication, a strong pre-engineering phase, solution-oriented suppliers, timely client feedback, and on-time delivery in accordance with the agreement.

Latest News

25/10/2026
SubseaDesign-SNEIG SSIV-01 cover
Successful delivery and installation of Equinor’s SNEIG SSIV
21/10/2026
Frame-Cover
A custom BOP-tethering system for a 1980s platform
20/08/2026
ONS
SubseaDesign will be attending ONS in Stavanger!
20/08/2026
wind01
SubseaDesign's wind tower connector: prototype success & path to qualification
30/06/2026
News-ServicesSD
Comprehensive subsea engineering solutions